Skip to content
NPI — NexSource Power Inc.

Leases, batteries, stations and camps

Oilfield generator rentals.

Generators sized from the lease's load list, motor by motor, and set up to burn the gas already there when the analysis allows it.

Supplied from the Red Deer shop to producing areas across Alberta and into Saskatchewan. For power at each stage of a well, from drilling to workovers, see oilfield production.

A grey skid-mounted NPI 375 kW natural gas generator with its exhaust on the roof, sitting on gravel in the NexSource yard
A 375 kW gas set on its skid. Skids sit on a lease pad without a trailer under them.

Load by load

What each oilfield load asks of a generator.

Two leases with the same total kW can need different sets. It comes down to what is on the end of the cable.

Pump jacks

The motor's load rises and falls with every stroke. On a unit that is out of balance, the falling rods can drive the motor and push power back toward the generator, which a set does not absorb well and may trip on.

Sizing it: Check the counterbalance before blaming the set, and keep other load on the same generator.

ESPs and pumps on drives

A variable frequency drive draws current in pulses rather than a smooth wave. Those harmonics heat the alternator and can distort the voltage everything else on the lease sees.

Sizing it: The alternator is sized up for the drive load. Send the drive's make and pulse count.

Compressors and large motors

A motor started across the line pulls several times its running current until it is up to speed. On a lease, that one start is often what sets the size of the generator.

Sizing it: Soft starters, drives or starting the largest motor first all bring the set down.

Heat trace and electric heaters

A steady, resistive load that a generator handles easily once it is warm. Self-regulating heat trace switched on cold draws far more than its running current for the first minutes.

Sizing it: Size for the cold start, or bring the circuits on one at a time.

Instruments, SCADA and controls

A small load that cannot stand a dropout. On its own it leaves a diesel set running far below its rating, which fouls the engine over a long term.

Sizing it: Use a small set for a small load, and a UPS where a blip would matter.

Shacks and camps

Lights, heat, kitchens and washcars, mostly single-phase. Left to chance, those loads pile onto one phase and unbalance the set.

Sizing it: Spread the circuits across the three phases at the panel.

Rating, motor starting and voltage for industrial loads in general are covered on industrial generator rental. A lease that will run on the set for months is prime duty; see prime power rentals.

On the lease

Four things a lease does to a rental.

It feeds the set its own gas

Lease gas is free fuel only if the engine can take it. H₂S, liquids and pressure are read off the analysis, and they decide the regulation and whether a fuel gas scrubber goes ahead of the set. Gas that fails goes back to propane or diesel.

It decides where the set sits

The operator's area classification sets how far the generator stays from wellheads, tanks and vents. Bring the drawing or the spacing rules to the quote, along with where the cable has to run.

It runs with nobody watching

Most lease sets run alone for weeks. Service visits are booked into the term, and the field service line, (403) 887-4567, answers at any hour; when a technician can get to the lease is settled on the call. See generator service.

It has seasons

Winter needs a set ordered for the cold and heat for whatever it powers. Spring road bans can decide when a heavy package is allowed in or out, so a move planned near breakup is planned around them.

COR and ISNetworld are held. Anything else the operator needs from a supplier on its lease is checked while the quote is written.

Rental fleet

Gas and diesel sets on rent.

Every rental generator in the inventory, refreshed hourly and split by fuel, because on a lease the fuel is usually decided first. Whether a gas set will run on your lease gas is answered by the analysis, not the listing.

Diesel

For leases with no usable gas, short jobs and heavy motor starts.

UnitOutputVoltage
60 kW Quiet Site Diesel Generator Set60 kWOn request
Used 150 kW Diesel Generator150 kW277/480 V
175 kW Diesel Generator175 kW208/240/480V
200 kW Mobile Diesel Generator200 kWOn request
Cummins 230 kW Mobile Diesel Generator230 kW120/208 V · 277/480 V, 3 phase
Airman 320 kW Mobile Diesel Generator320 kW120/208 V · 277/480 V, 3 phase
500 kW Diesel Generator500 kW120–600V

Sets built in Red Deer for this work are on the NPI Series. Above a megawatt, see 1 MW generator rental.

Rented alongside

On the same order as the generator.

Fuel tanks

Double-wall storage for a diesel set where no gas is usable.

Fuel tank rentals

Fuel gas scrubbers

Knock liquids out of lease gas before it reaches the engine.

Fuel gas scrubber

Why heaters without a flame suit a lease is set out in flameless heaters for oilfield and construction work.

Before you call

What to send with an oilfield enquiry.

With these, the first reply can name the set and what goes with it, instead of coming back with questions.

  1. 1The LSD or nearest town, and what the access is like that season.
  2. 2Every motor's horsepower and how it starts: across the line, soft starter or drive.
  3. 3The voltage the lease runs at.
  4. 4A recent gas analysis with H₂S and liquids, and the pressure at the tie-in. Or say there is no gas.
  5. 5The term, the season, and the coldest temperature expected.
  6. 6The operator's prequalification platform, if it is not ISNetworld.

Oilfield rental questions

Asked from the lease.

What size generator does a pump jack need?

Start from the motor's nameplate horsepower and how it is started. A set that carries the running load comfortably can still trip when the motor starts across the line, so the starting method matters as much as the size. Where several pump jacks share a set, starting them one after another keeps the generator smaller.

Can a generator run an ESP on a variable frequency drive?

Yes, with the alternator sized for it. A drive's harmonic current heats the alternator and distorts voltage, so the set is chosen with more alternator than the kW alone would suggest. The drive's make, rating and pulse count let that be worked out before the quote.

Why does our generator trip on reverse power at the pump jack?

On a pump jack that is out of balance, the rods can overrun the motor for part of the stroke and send power back toward the source. The grid absorbs that; a generator protects itself by tripping. Balancing the unit cures it, and so does keeping enough other load on the set to soak up what comes back.

Can a rental generator run on sour gas?

Only within the engine maker's limit for H₂S, and only once the analysis is in hand. Sour gas corrodes engine parts and contaminates the oil, so above the limit the set runs on sweet gas from elsewhere, propane or diesel instead.

Are the generators rated for hazardous locations?

No hazardous-location rating is stated on the listings, so none should be assumed. Where the set sits is decided from the operator's area classification and spacing rules, which keep it clear of the classified zones around wellheads, tanks and vents.

Do you rent oilfield heaters too?

Yes. Flameless heaters are on the rental list (TD425, TD625, TD1200) and can go out on the same order as the generator. They heat without a burner flame, which matters around wellheads and tanks.

Can one generator run several wells?

If the wells are close enough to reach with cable, yes. Run length and voltage drop decide how far a set can reach, and the motor starts on every well have to fit the one generator. Wells spread across a section are often cheaper on a set each.

Send the motor list and the gas analysis.

The quote comes back with the set, its fuel equipment, the distribution to each load, and any heat or storage the lease needs.