Waiting for a utility connection
Your building or plant is ready for equipment, but permanent service has a later energization date. A gap power package can carry the agreed loads while the utility completes its work.
Commercial generator rentalsKeep your site working while permanent power catches up, with generator packages and field support from Red Deer.

A delayed utility connection can leave a finished facility waiting to start. Temporary gap power supplies the equipment you need to run while permanent service, switchgear or generation is being completed.
NexSource brings together generator rentals, distribution equipment and field support from Red Deer. Start with your load and the date you need power. We will work through the equipment and service scope with you, including what happens if the grid connection date moves.
Match the temporary supply to the work that can move forward. The load, duration and connection arrangements will differ for each project.
Your building or plant is ready for equipment, but permanent service has a later energization date. A gap power package can carry the agreed loads while the utility completes its work.
Commercial generator rentalsBring selected systems online for startup and testing before permanent generation or grid service is available. Build the temporary supply around the commissioning sequence and the loads introduced at each stage.
Load banks for testingKeep essential operations supplied while switchgear, transformers or the main service are being replaced. Agree on the isolation, temporary connection and changeover window with the site's electrical team.
Transfer switch rentalsIndustrial facilities and data centres may need power in stages as equipment arrives. Discuss a modular generator arrangement, the next load increase and how the rental will end when permanent supply is ready.
Megawatt generator rentalsThe generator is one part of the rental. Confirm the connections, fuel arrangements and service plan alongside it.

Diesel, natural gas or propane options selected around the load, operating hours and available fuel. For larger loads, discuss multiple generators and the controls needed to operate them together.
Identify the distribution panels, cabling, transfer equipment and any voltage transformation required between the generator and the connection point.
Confirm fuel storage, delivery responsibilities, site access and maintenance intervals before the rental starts. Longer operating hours make the service plan part of the equipment decision.
The expected grid date is the starting point. The plan also needs to cover changing loads, service access and the transfer to permanent power.
Send a load list or single-line diagram. Include voltage and phase, motor starts, equipment added later and daily operating hours. Generator selection needs to account for starting demand as well as running load.
Review the generator position, cable routes, fuel access, noise requirements and connection point. Identify who is responsible for the electrical connections, permits and commissioning in the quoted scope.
Share the expected grid connection date and any uncertainty around it. Ask about the rental extension terms, service visits and how capacity can change if the facility starts operating in phases.
Plan the transfer to permanent power with the site electrical team. Confirm the acceptable interruption, testing and equipment removal. Critical loads may need a suitable UPS or another ride-through arrangement during changeover.
Compare the total cost of the temporary supply over the expected term. Rental charges, fuel consumption, transport and service visits all affect the budget.
A larger set can leave you paying to run capacity the site rarely uses. A smaller set may struggle with motor starts or later load additions. Send the load profile so NexSource can help size the package.
For an early estimate, use the generator sizing and fuel calculators. Final selection and fuel planning depend on the equipment and duty.
If the load is still being worked out, tell us what needs to run. The team can help you identify the next information to gather.
Temporary gap power is an interim electricity supply used until a permanent source is ready. It is also called bridging power or bridge power. A generator package supplies the agreed site loads during a grid connection delay, permanent generator installation or electrical infrastructure upgrade.
Gap power usually supplies a site for an agreed period while it waits for permanent service. Standby power is kept available to support loads when their normal source fails. The expected running hours and load profile affect generator selection and maintenance. Tell NexSource how the equipment will operate so the package can be specified for that duty.
Yes. NexSource provides temporary gap power for industrial facilities awaiting permanent grid connection. Share the site location, load requirements, required start date and expected utility connection date. Equipment availability, delivery timing and the installation scope are confirmed for each project.
A package can be planned for an extended operating period, subject to a suitable generator rating, fuel supply and maintenance arrangement. Continuous operation needs a service plan from the start. Discuss rental extensions, refuelling access and any redundancy required to support your operations during service work.
The choice depends on the available fuel, load, operating hours and site conditions. Diesel can suit a site that needs self-contained fuel storage. Natural gas or propane may be considered where a suitable supply is available. NexSource can review the options; fuel quality, pressure and delivery arrangements must be confirmed for the selected equipment.
The package is quoted around the site requirements. It can include generators, distribution panels, cabling, transfer equipment, transformers and fuel storage. Installation, commissioning and ongoing field support should be defined in the scope, including the responsibilities of NexSource, your electrical contractor and your fuel supplier.
A written quote depends on generator capacity, operating duty, rental duration, distribution requirements and site location. Fuel, transport, connection work, maintenance and any redundancy also affect the total cost. Send a load list and project dates so NexSource can price the package and identify what is included.
The transfer arrangement determines the interruption. A standard transfer switch does not guarantee uninterrupted power. Loads that cannot tolerate a break may need a suitable UPS or another engineered ride-through arrangement. The site electrical team should agree on the changeover method and any utility requirements before the temporary supply is installed.
NexSource operates from Red Deer and supports projects across Alberta, including Calgary, Edmonton, Grande Prairie, Fort McMurray and Drayton Valley. For projects elsewhere in Western Canada, contact the team to confirm scope, logistics and equipment availability. Emergency dispatch is available 24/7 at (403) 887-4567.
Send your site details and the gap you need to cover. NexSource will review the requirements, confirm equipment availability and prepare a project-specific quote.
Based in Red Deer, supporting projects across Alberta. For work elsewhere in Western Canada, ask the team to confirm logistics and scope.