The fuel comes by pipe
A set on a gas line or on gas from the lease is never waiting for a fuel truck. On a job that runs for a season or for years, that removes the deliveries, the storage tank and the risk of a road closing in February.
When the generator is the power plant
Gas generators that run a site with no grid behind them, day and night, for months or for years.
The NPI Series is built in Red Deer for this work, and gas sets from other makers are on offer from stock. Each can be bought or rented, set up for the gas on site and run in parallel as the load grows.

Why gas for prime power
A set on a gas line or on gas from the lease is never waiting for a fuel truck. On a job that runs for a season or for years, that removes the deliveries, the storage tank and the risk of a road closing in February.
Pipeline gas does not age in a tank, gel in the cold or pick up water the way stored diesel can. The fuel the engine burns in month twelve is the same as in week one.
A prime set runs most hours of the year, so the engine choice matters more than the purchase price. Gas engines built for continuous industrial work are designed around that kind of duty.
What a prime rating means, and how it differs from standby and continuous, is on prime power generator rentals. Where no gas is available, diesel generators bring their own fuel.
What the site has to provide
A gas generator on prime duty is only as good as the gas and the load it is given. These are the points to settle before a set is chosen, not after it arrives.
The supply has to hold its pressure while the set is working hardest, all day, on top of whatever else is on the same line. Ask the utility or the lease operator for the pressure and the volume available before choosing a set.
Line gas is consistent. Lease and casing gas can carry liquids, hydrogen sulphide or heavy hydrocarbons that shorten an engine's life. A current gas analysis decides whether the gas can be used and what scrubbing and regulation go in front of the engine.
A spark-ignited gas engine takes on a sudden block of load less readily than a diesel. On a prime site, big motors are started one at a time, often on soft starters or drives, so the set never has to pick up everything at once.
An engine that idles along at a fraction of its rating for months wears in ways a working engine does not. Size the set close to the real load, or split the load across smaller sets that each run well-loaded.
A gas engine's output falls as the air thins and warms. A set rated at sea level may not make its nameplate figure on a hot day in the foothills, so the figure that counts is the derated one for your site.
Burning lease or casing gas is covered in more depth on industrial natural gas generator rentals, and the fuel consumption calculator gives a first figure to take to the gas supplier.
Built for it
NexSource designs and builds the NPI Series in its Red Deer shop as natural gas and propane packages for sites that run on their own power: producing leases, remote facilities, plants beyond the reach of a line.
The NPI250 and NPI350 have controllers that can parallel. That lets a site grow in steps instead of buying for a load it may never reach, and it lets one unit come off for servicing while the others carry the site.
Planned maintenance on NPI units includes oil sampling, so each change adds to a record of how the engine is wearing on that site's gas.
| Sets in parallel | NPI250 | NPI350 |
|---|---|---|
| One set | 250 kW | 350 kW |
| Two sets | 500 kW | 700 kW |
| Three sets | 750 kW | 1,050 kW |
Nameplate figures added together. Running a site at less than the total, so one set can be taken out of service, is usually the better plan.
Gas sets on offer
Every gas and dual-fuel set listed to rent or buy, refreshed from the inventory each hour. A set is marked as paralleling only when its own listing says so; the rating it carries on your site is confirmed in the quote.
| Unit | Output | Voltage | Parallels | Offered |
|---|---|---|---|---|
| NPI NG50 · 50 kW Natural Gas / Propane Generator | 50 kW | 480 V | Not stated | Rent or buy |
| 70 kW Cummins Natural Gas Generator | 70 kW | 480 V | Not stated | Rent or buy |
| 125 kW Natural Gas Generator | 125 kW | 480V | Not stated | Rent or buy |
| XQ135 kW Portable Natural Gas Generator | 135 kW | 480 V / 600 V | Listed as parallel-capable | Rent or buy |
| MAN 155 kW Generator Package | 155 kW | 480 V | Listed as parallel-capable | Buy |
| NPI Series 170 · 170 kW Natural Gas / Propane Generator | 170 kW | 480 V | Not stated | Rent or buy |
| 200 kW · 600 V Natural Gas Generator | 200 kW | 347/600 V | Not stated | Rent or buy |
| NPI250 · 14L · 250 kW Generator Set | 250 kW | 480 V | Listed as parallel-capable | Rent or buy |
| NPI-350 · 350 kW Natural Gas / Propane Generator | 350 kW | 480 V | Listed as parallel-capable | Rent or buy |
| Caterpillar 375 kW Natural Gas / Propane Generator | 375 kW | 600 V, 3 phase | Not stated | Rent or buy |
| 400 kW Natural Gas Generator | 400 kW | 208–600V, 3-Phase | Not stated | Rent |
| Caterpillar XQ1250G Natural Gas Generator Set | 1,250 kW | 480 V | Listed as parallel-capable | Rent or buy |
| Used XQ1475 kW Natural Gas Generator | 1,475 kW | 480 V | Not stated | Rent or buy |
| 1900 kW Natural Gas / Propane Generator | 1,900 kW | On request | Not stated | Rent or buy |
By size, see the 70 kW, 200 kW and 250 kW gas pages or generators by size. Past a megawatt, see megawatt power.
Buy or rent
For a facility that will run on its own power for years: no utility line coming, or one too costly to bring in. Ownership puts the set on the site's books, and the service plan is set up when it is commissioned.
Natural gas generators for saleFor a site waiting on a tie-in, a well still being proven, or a load that may change. Servicing is arranged with the rental, and sets can be added or swapped as the load becomes clear.
Prime power generator rentalsNexSource works from one shop, at 77 Queensgate Crescent in Red Deer. Sets for prime sites across Alberta and Saskatchewan are prepared and serviced from there, and the field service line, (403) 887-4567, is answered 24 hours a day. See generator service.
Prime gas questions
A gas-fuelled generator rated to be a site's only source of power, running for unlimited hours at a load that varies through the day. It is chosen against its prime rating, which is lower than the standby figure on the same nameplate.
As long as the gas supply holds and the servicing keeps pace. A prime set is built to run around the clock; what eventually stops it is an oil change or a scheduled inspection, which is why a second set, or one unit spare among several, is planned for sites that cannot go down.
Often, but not on trust. Send a recent gas analysis along with the pressure and the volume available. That decides whether the gas suits the engine and what has to treat it first.
Gas where it is available and the load can be started in steps. Diesel where there is no gas, or where very large loads have to come on all at once.
Yes, if the sets are built to parallel. The NPI250 and NPI350 carry parallel-capable controllers, so a second or third unit can join the first on the same bus. On other sets, check the Parallels column above or the listing itself.
Buy when the site will need its own power for years: a facility with no prospect of a utility connection, or one where the connection is uneconomic. Rent when the end date is known or uncertain, such as waiting for a tie-in or testing a well. Many listings can be quoted both ways for comparison.
There are no published prices. The set, purchase or rental term, the gas train, any transformer and switchgear, transport from Red Deer and the service plan are all itemised in the quote.
With a gas analysis or the utility's pressure figure, that is enough to name the sets, how they would share the load and whether to buy or rent.