Rental power, quoted as one package

Temporary power rental, from the fuel to the load.

A generator on its own powers nothing. The rental also needs fuel, the right voltage, a safe way to switch, and cable and panels out to the work.

NexSource rents every piece of that chain from Red Deer and quotes it together, so the set that arrives on site has what it needs to connect.

Three grey NPI generator sets lined up outside the NexSource building in Red Deer
Rental sets outside the Red Deer shop, where every package is prepared before it ships.

What gets rented

Six pieces between the fuel and your equipment.

Not every site needs all six. Each one below says what it does, what decides its size, and what is on the rental list right now, including generators from 25 kW to 1,900 kW. The lists read from the inventory every hour.

  1. 01 · FUEL

    Something to burn

    A diesel set has a base tank under it; when that will not last between deliveries, an external double-wall tank goes beside it. A gas set needs a line or lease gas at a pressure the regulator can work with, and wet field gas goes through a scrubber before the engine sees it.

    Sized by: How many hours between fills, or the gas pressure and analysis at the tie-in.

    On the rental list (2)

  2. 02 · GENERATION

    The generator

    Natural gas, dual-fuel or diesel, trailer- or skid-mounted, picked for the largest motor start the site will throw at it as much as the running load. One set is simplest. Two or more in parallel let you run what the load needs and shut one down for service.

    Sized by: The running load in kW, the largest motor and how it starts, and the voltage.

  3. 03 · VOLTAGE

    A transformer, when the voltages differ

    Rental sets are wound for 600 V, 480 V or 208 V. When the site runs on something else, or a 600 V set has to feed trailers and receptacles as well as motors, a step-up or step-down transformer sits between them.

    Sized by: kVA, worked out from the load it will carry, and the voltage on each side.

    On the rental list

    Transformers are quoted per job, once the voltage on both sides is known, so none are listed as units.

  4. 04 · SWITCHING

    A transfer switch, when there is another source

    If the building has utility power or its own standby generator, a transfer switch keeps the rental and that source from ever feeding the same bus. A manual switch suits a planned outage with someone on hand. An automatic one starts the set and changes over when nobody is there.

    Sized by: The amperage of the service it switches, the voltage, and whether anyone will be on site to throw it.

  5. 05 · DISTRIBUTION

    Cable and panels to the loads

    Cable runs from the set to distribution panels placed close to the work, where the trades plug in and each feeder has its own breaker. On a spread-out site, two or three panels are usually easier to live with than one long run to a single box.

    Sized by: Where the loads sit, the amps each feeder draws and the distance from the set.

    On the rental list (1)

  6. 06 · TESTING

    A load bank, when the load is not there yet

    A diesel set that runs lightly loaded for weeks wet-stacks, leaving unburnt fuel and carbon in the exhaust. A load bank puts a known, steady load on it: to prove a set before a critical start, to commission a new installation, or to burn off a set that has been idling.

    Sized by: The kW to be proven and the voltage of the set under test.

Working through winter? Flameless heaters can run off the same package and go on the same quote. To browse everything, rental or sale, see the full inventory.

By type of job

The job decides what goes on the quote.

How long the power runs each day, and for how many weeks, matters as much as the size of the load. These are the patterns that come up most.

Building before its service is live

Day shifts, with the load growing floor by floor

One set, panels moved as the work moves, a step-down transformer for trailers and tools, a fuel tank, heaters through winter

Construction site power

Plant turnaround or shutdown

Around the clock for a fixed window

A larger set with panels spread across the laydown, a fuel plan for the full window, sometimes a second set as backup

Turnaround power

Facility waiting on its utility connection

Continuous, with an end date that can move

Sets sized for continuous duty, a transfer switch at the main, a service schedule for the term

Temporary and gap power

Outage, repair or standby cover

Hours to weeks, sometimes on standby only

A set matched to the building's own service and a manual or automatic transfer switch

Emergency and standby

Lease, pad or camp off the grid

Continuous prime power

A gas set on lease or line gas with a scrubber, or diesel with a large tank; often two sets to rotate

Prime power

Event or outdoor venue

A day to a week, many small loads

A set, cable and panels spread across the grounds, sized to the stages, vendors and lighting

Event power

How it is put together

From a load list to power on site.

Most of the work happens before anything is loaded on a truck. A package sized on paper first avoids the second delivery for a missing panel or the wrong transformer.

If you want a figure before you call, the power calculators convert kW, kVA, amps and horsepower. For a rental measured in seasons rather than weeks, compare a generator lease.

  1. 1

    Send the load

    A load list, a single-line drawing or a description of what has to run, with the voltage, the site and the dates. Rough numbers are enough to start.

  2. 2

    The package is drawn up

    The written quote lists each piece, from the fuel to the panels, says who makes the connections, and includes the transport. Sizing advice is part of it and costs nothing.

  3. 3

    Prepared in Red Deer

    Every set leaves the shop at 77 Queensgate Cres set up for the site's voltage and fuel and run under load, with the cable and gear going out with it.

  4. 4

    Connected on site

    The site's licensed electrician makes the connections, or a contractor is arranged within the package. The quote says which.

  5. 5

    Supported while it runs

    Field service answers 24/7 at (403) 887-4567 for the life of the rental. How soon someone can be at the site is confirmed on each call.

Temporary power questions

Renting temporary power.

What is a temporary power rental?

Rented equipment that supplies electricity to a site for a set period: a generator, the fuel for it, and the transformer, switching, cable and panels needed to get its output to the equipment that will use it. It ends when the job does or when permanent power arrives.

What comes with a rented generator?

That depends on the site, so it is spelled out in the quote rather than assumed. A typical package adds a fuel tank or gas regulation, cable, one or more distribution panels and, where the voltages differ or there is another source, a transformer or transfer switch.

Who connects temporary power to my equipment?

Your site's licensed electrician, or a contractor arranged as part of the rental package. The quote names the cable, panels and switching supplied and states who is responsible for making the connections.

How long can I rent temporary power for?

The term is set in the written quote around your dates, whether that is a few days for an event or months while a facility waits on its utility. For terms running into seasons or years, a lease may suit better.

How much does temporary power rental cost?

There are no published rates, because the total depends on the generator size, how many hours a day it runs, the term, the distribution and switching, fuel and the transport to the site. Send the load and the dates and the quote prices each part.

Should temporary power run on diesel or natural gas?

If there is a gas line or usable lease gas, a natural gas set avoids trucking fuel in for the whole term. Where there is no gas, a diesel set with an external tank is self-contained. The fuel question usually decides the generator before the size does.

Where do you supply temporary power?

Across Alberta and into Saskatchewan. Everything goes out from the one NexSource location in Red Deer, and the transport is part of the written quote.

Supplying a site east of the border? See generator rental in Saskatchewan.

Price the whole package at once.

Send what has to run, the voltage, the fuel on site and the dates. The quote comes back in writing with every piece from the fuel to the panels.