Building before its service is live
Day shifts, with the load growing floor by floor
One set, panels moved as the work moves, a step-down transformer for trailers and tools, a fuel tank, heaters through winter
Construction site powerRental power, quoted as one package
A generator on its own powers nothing. The rental also needs fuel, the right voltage, a safe way to switch, and cable and panels out to the work.
NexSource rents every piece of that chain from Red Deer and quotes it together, so the set that arrives on site has what it needs to connect.

What gets rented
Not every site needs all six. Each one below says what it does, what decides its size, and what is on the rental list right now, including generators from 25 kW to 1,900 kW. The lists read from the inventory every hour.
01 · FUEL
A diesel set has a base tank under it; when that will not last between deliveries, an external double-wall tank goes beside it. A gas set needs a line or lease gas at a pressure the regulator can work with, and wet field gas goes through a scrubber before the engine sees it.
Sized by: How many hours between fills, or the gas pressure and analysis at the tie-in.
On the rental list (2)
02 · GENERATION
Natural gas, dual-fuel or diesel, trailer- or skid-mounted, picked for the largest motor start the site will throw at it as much as the running load. One set is simplest. Two or more in parallel let you run what the load needs and shut one down for service.
Sized by: The running load in kW, the largest motor and how it starts, and the voltage.
On the rental list (21)
03 · VOLTAGE
Rental sets are wound for 600 V, 480 V or 208 V. When the site runs on something else, or a 600 V set has to feed trailers and receptacles as well as motors, a step-up or step-down transformer sits between them.
Sized by: kVA, worked out from the load it will carry, and the voltage on each side.
On the rental list
Transformers are quoted per job, once the voltage on both sides is known, so none are listed as units.
04 · SWITCHING
If the building has utility power or its own standby generator, a transfer switch keeps the rental and that source from ever feeding the same bus. A manual switch suits a planned outage with someone on hand. An automatic one starts the set and changes over when nobody is there.
Sized by: The amperage of the service it switches, the voltage, and whether anyone will be on site to throw it.
On the rental list (2)
05 · DISTRIBUTION
Cable runs from the set to distribution panels placed close to the work, where the trades plug in and each feeder has its own breaker. On a spread-out site, two or three panels are usually easier to live with than one long run to a single box.
Sized by: Where the loads sit, the amps each feeder draws and the distance from the set.
On the rental list (1)
06 · TESTING
A diesel set that runs lightly loaded for weeks wet-stacks, leaving unburnt fuel and carbon in the exhaust. A load bank puts a known, steady load on it: to prove a set before a critical start, to commission a new installation, or to burn off a set that has been idling.
Sized by: The kW to be proven and the voltage of the set under test.
On the rental list (7)
Working through winter? Flameless heaters can run off the same package and go on the same quote. To browse everything, rental or sale, see the full inventory.
By type of job
How long the power runs each day, and for how many weeks, matters as much as the size of the load. These are the patterns that come up most.
| The job | How the power runs | Usually on the quote | More |
|---|---|---|---|
| Building before its service is live | Day shifts, with the load growing floor by floor | One set, panels moved as the work moves, a step-down transformer for trailers and tools, a fuel tank, heaters through winter | Construction site power |
| Plant turnaround or shutdown | Around the clock for a fixed window | A larger set with panels spread across the laydown, a fuel plan for the full window, sometimes a second set as backup | Turnaround power |
| Facility waiting on its utility connection | Continuous, with an end date that can move | Sets sized for continuous duty, a transfer switch at the main, a service schedule for the term | Temporary and gap power |
| Outage, repair or standby cover | Hours to weeks, sometimes on standby only | A set matched to the building's own service and a manual or automatic transfer switch | Emergency and standby |
| Lease, pad or camp off the grid | Continuous prime power | A gas set on lease or line gas with a scrubber, or diesel with a large tank; often two sets to rotate | Prime power |
| Event or outdoor venue | A day to a week, many small loads | A set, cable and panels spread across the grounds, sized to the stages, vendors and lighting | Event power |
Day shifts, with the load growing floor by floor
One set, panels moved as the work moves, a step-down transformer for trailers and tools, a fuel tank, heaters through winter
Construction site powerAround the clock for a fixed window
A larger set with panels spread across the laydown, a fuel plan for the full window, sometimes a second set as backup
Turnaround powerContinuous, with an end date that can move
Sets sized for continuous duty, a transfer switch at the main, a service schedule for the term
Temporary and gap powerHours to weeks, sometimes on standby only
A set matched to the building's own service and a manual or automatic transfer switch
Emergency and standbyContinuous prime power
A gas set on lease or line gas with a scrubber, or diesel with a large tank; often two sets to rotate
Prime powerA day to a week, many small loads
A set, cable and panels spread across the grounds, sized to the stages, vendors and lighting
Event powerHow it is put together
Most of the work happens before anything is loaded on a truck. A package sized on paper first avoids the second delivery for a missing panel or the wrong transformer.
If you want a figure before you call, the power calculators convert kW, kVA, amps and horsepower. For a rental measured in seasons rather than weeks, compare a generator lease.
A load list, a single-line drawing or a description of what has to run, with the voltage, the site and the dates. Rough numbers are enough to start.
The written quote lists each piece, from the fuel to the panels, says who makes the connections, and includes the transport. Sizing advice is part of it and costs nothing.
Every set leaves the shop at 77 Queensgate Cres set up for the site's voltage and fuel and run under load, with the cable and gear going out with it.
The site's licensed electrician makes the connections, or a contractor is arranged within the package. The quote says which.
Field service answers 24/7 at (403) 887-4567 for the life of the rental. How soon someone can be at the site is confirmed on each call.
Temporary power questions
Rented equipment that supplies electricity to a site for a set period: a generator, the fuel for it, and the transformer, switching, cable and panels needed to get its output to the equipment that will use it. It ends when the job does or when permanent power arrives.
That depends on the site, so it is spelled out in the quote rather than assumed. A typical package adds a fuel tank or gas regulation, cable, one or more distribution panels and, where the voltages differ or there is another source, a transformer or transfer switch.
Your site's licensed electrician, or a contractor arranged as part of the rental package. The quote names the cable, panels and switching supplied and states who is responsible for making the connections.
The term is set in the written quote around your dates, whether that is a few days for an event or months while a facility waits on its utility. For terms running into seasons or years, a lease may suit better.
There are no published rates, because the total depends on the generator size, how many hours a day it runs, the term, the distribution and switching, fuel and the transport to the site. Send the load and the dates and the quote prices each part.
If there is a gas line or usable lease gas, a natural gas set avoids trucking fuel in for the whole term. Where there is no gas, a diesel set with an external tank is self-contained. The fuel question usually decides the generator before the size does.
Across Alberta and into Saskatchewan. Everything goes out from the one NexSource location in Red Deer, and the transport is part of the written quote.
Supplying a site east of the border? See generator rental in Saskatchewan.
Send what has to run, the voltage, the fuel on site and the dates. The quote comes back in writing with every piece from the fuel to the panels.